Research on Design of Deep Excavation Engineering under Complex Working Conditions
This paper takes the deep foundation pit engineering of a factory area under complex working conditions such as high groundwater and thick soil layer as an example,through the analysis of various limiting factors and the comparison of schemes,the design concept,construction steps and matters needing attention of the foundation pit are introduced in detail.
deep foundation pitground waterwater stop curtainsupport