Application of Bored Cast-in-place Pile Technology in Bridge Engineering Construction
In order to solve the problem of foundation stability in the construction of bridge engineering,this paper conducts in-depth research on the drilling and pouring pile technology in the water damage restoration and reconstruction project of Jiangding cliff in Nanyu Township,Zhouqu County,G345 line,and explores the key construction points of drilling and pouring pile technology,including construction preparation,drilling and clearing,and steel cage system.Installation and underwater concrete pouring,etc.,in order to provide technical reference for the construction of similar projects.
drilling and pouring pile technologybridge engineeringconstruction technology