摘要
本文以苏州市轨道交通6号线工程土建施工项目Ⅵ-TS-11标斜步站建设施工项目为例,基于施工准备、脚手架搭设、支撑结构搭设、模板与立杆稳定性计算、模板安装与拆除等环节对高支模施工技术的基本流程进行了梳理,同时明确了地铁项目土建施工过程中高支模施工技术的注意事项.
Abstract
This article takes the civil construction project of Suzhou Metro Line 6,Section Ⅵ-TS-11,as an example.Based on construction preparation,scaffolding installation,support structure installation,formwork and pole stability calculation,formwork installation and removal,the basic process of high formwork construction technology is summarized.At the same time,the precautions for high formwork construction technology in the civil construction process of subway projects are clarified.