首页|某在建工程中深海域排海管施工技术分析

某在建工程中深海域排海管施工技术分析

扫码查看
随着经济快速发展和环保意识的加强,海滨城市工业园区处理后达标水排海需求凸显.本文以北海市铁山港工业区A5深海排放管工程为例,详细介绍了深海域排海管工程中的管道吊装、盲板拆除、管道托运和管道安装及对接的施工工艺技术.在本工程的施工过程中,各个环节实施顺利,质量可控,解决了本工程中深水海域部分排海管道施工难题,可为后续类似工程提供参考.
Technical Analysis of the Construction of a Deep Sea Drainage Pipe in a Project under Construction
With the rapid economic development and the strengthening of environmental protection awareness,the demand for sea discharge of treated and standardized water from industrial parks in seaside cities is highlighted.This paper takes the A5 deep-sea discharge pipe project of Beihai Tieshangang Industrial Zone as an example,and introduces in detail the construction process technology of pipeline lifting,blind removal,pipeline transportation and pipeline installation and docking in the deep-sea discharge pipe project.During the construction process of this project,the implementation of each link is smooth and the quality is controllable,which solves the construction problems of some of the deep sea discharge pipes in deep sea area in this project,and can provide reference for the subsequent similar projects.

sea discharge pipesdeep seasconstruction technology

杨成海、戚双星、孟涛

展开 >

中化学南方建投(广西)有限公司,广西南宁

中化学南方建投(江西)有限公司,江西赣州

排海管 深海域 施工技术

2024

科学技术创新
黑龙江省科普事业中心

科学技术创新

影响因子:0.842
ISSN:1673-1328
年,卷(期):2024.(19)