某水电站工程规模大,输水线路长度相对短,地下厂房距离坝轴线约210 m,蓄水后渗流特性或将成为影响正常运行的重要因素.通过建立渗控系统的三维有限元模型,开展工程区域在各种工况下的三维渗流分析.计算结果表明:防渗排水系统方案布置合理、有效,可满足地下厂房系统运行要求.
Analysis and Research on Seepage Control of Underground Powerhouse of a Certain Hydropower Station
The scale of a certain hydropower station project is large,and the length of the water transmission line is relatively short.The underground powerhouse is about 210 m away from the dam axis.The seepage characteristics after water storage may become an important factor affecting normal operation.By establishing a three-dimensional finite element model of the seepage control system,conduct three-dimensional seepage analysis of the engineering area under various working conditions.The calculation results indicate that the layout of the anti-seepage and drainage system scheme is reasonable and effective,and can meet the operational requirements of the underground power plant system.

underground powerhouseseepage preventiondrainage

吴银刚、孔宇田、杨东、龙益彬、孙志军

展开 >

中国电建集团贵阳勘测设计研究院有限公司,贵州贵阳

地下厂房 防渗 排水

2024

科学技术创新
黑龙江省科普事业中心

科学技术创新

影响因子:0.842
ISSN:1673-1328
年,卷(期):2024.(21)