The Application of Antiwear Technique in First Batch Circulating Fluidized Bedboiler"Four-tube"Key Position of Shanghai Boiler Factory
The"four-tube"structure、characteristic and component of boiler in a power plant is introduced in detail,and summarize"four-tube"key antiwear position of the boiler in recent ten years actual motion.Combined with many on-site maintenance experience and in-depth theoretical analysis,analyze the causes of severe wear in this key part,and put forward the technical scheme according to the analysis results,the techni-cal optimization of the construction of the key position is conducted by using multiple maintenance opportuni-ties.The construction technology optimization scheme of the"four pipes"of the boiler has important guiding significance for the maintenance of the"four pipes"of similar boilers.