The Actual Application of Process and General Layout Combined in aLNG Emergency Peak Regulation Station
[Purposes]This paper aims to solve the problem of the existing LNG(Liquefied Natural Gas)emergency peak regulation gas source facilities being unable to meet the sudden increase in gas supply demand in the future.[Methods]The study adopted a comprehensive design approach,focusing on the process design and overall planning of LNG emergency peak regulation stations.Through a detailed analysis of the synergistic effect between the two,this paper explores how to achieve an organic combina-tion of process and general layout in the design process,in order to improve the overall efficiency and adaptability of the facility.[Findings]Combining process design with general layout can significantly im-prove the operational efficiency and safety of LNG emergency peak regulation stations.This integrated design method not only optimizes the spatial layout,but also promotes the smoothness of the operation process,ensuring the ability to respond quickly in emergency situations.[Conclusions]By effectively combining process design with overall planning,an efficient,safe,and highly flexible LNG peak regula-tion system can be constructed to ensure stable gas supply to cities during high demand periods such as winter.