盾构下穿古城区地面沉降预测及现场监测分析

扫码查看
[目的]为了获取武汉市和平大道南延线盾构段地面的沉降数据,本研究通过Peck公式对现场沉降监测结果进行了拟合分析,并对Peck公式进行了修正.[方法]每30 m设置沿隧道上部对称分布的监测点进行现场地表沉降监测,选取其中4个最具代表性的断面沉降结果进行Peck公式拟合分析和验证,并根据实际沉降情况对Peck公式进行修正.[结果]研究结果表明,在隧道轴线上部存在异常沉降,因此通过对后续掘进段掘进参数进行调整,加强壁后同步注浆和监控测量控制沉降,并且将得到的沉降槽曲线与Peck公式进行拟合,得到4个断面的实测沉降数据与拟合曲线的拟合优度R2均高于0.85.[结论]盾构段沉降槽曲线与Peck公式计算结果高度拟合,可以用Peck公式对研究区沉降进行预测,选取地层体积损失率Vl为0.95%,沉降槽宽度系数k为0.55对Peck公式进行修正后,可以更加简单高效地预测后续沉降.
Ground Subsidence Prediction and On-Site Monitoring Analysis of Shield Tunneling Under the Ancient City
[Purposes]In order to obtain the ground subsidence law of the shield tunneling section of the South Extension of Heping Avenue in Wuhan City,this paper conducted fitting analysis of the field settlement monitoring results through the Peck formula,and revised the formula.[Methods]A monitoring point symmetrically distributed along the upper part of the tunnel is set every 30 m for on-site surface settlement monitoring.Four of the most representative section settlement results are selected for Peck for-mula fitting analysis,and the Peck formula is verified.The Peck formula is modified based on the actual settlement situation.[Findings]It shows that there is abnormal settlement at the upper part of the tunnel axis.Therefore,the settlement is controlled by adjusting the excavation parameters of the subsequent ex-cavation section,strengthening the synchronous grouting behind the wall and monitoring measurement,and the settlement trough curve obtained is matched with the Peck formula.The goodness of fit R2 be-tween the measured settlement data of the four sections and the fitting curve is higher than 0.85.[Con-clusions]The high fit between the settlement groove curve of the shield tunnel section and the Peck for-mula calculation results can be used to predict the settlement in Wuhan area.Choosing a stratum volume loss rate of 0.95%and a settlement groove width coefficient of 0.55 can make the Peck formula more simple and efficient in predicting subsequent settlement after correction.

shieldon-site monitoringsurface subsidence predictionPeck formulasettlement control

张翔、李义翔、陈健、刘滨、舒计城

展开 >

武汉市市政工程质量监督站,湖北 武汉 430015

中铁十四局集团有限公司,山东 济南 250101

中铁十四局集团大盾构工程有限公司,江苏 南京 210000

中国铁建水下隧道工程实验室,山东 济南 250101

中国科学院武汉岩土力学研究所岩土力学与工程国家重点实验室,湖北武汉 430071

展开 >

盾构 现场监测 地表沉降预测 Peck公式 沉降控制

2024

河南科技
河南省科学技术信息研究院

河南科技

影响因子:0.615
ISSN:1003-5168
年,卷(期):2024.51(17)