首页|浙江景宁抽水蓄能电站工程地质调查及评价

浙江景宁抽水蓄能电站工程地质调查及评价

扫码查看
[目的]对浙江景宁抽水蓄能电站进行工程地质调查及评价,以查明是否存在工程地质问题.[方法]基于地质测绘、钻探、物探、室内试验测试等工程手段对水库区、坝址区开展了详细的工程地质调查和分析.[结果]研究结果表明,景宁抽水蓄能电站工程地质条件较好,不存在较为严重的工程地质问题.[结论]研究结果对景宁抽水蓄能电站下一步工程设计、施工方案确定等方面具有重要指导意义.
Engineering Geological Investigation and Evaluation of Jingning Pumped Storage Power Station in Zhejiang Province
[Purposes]The engineering geological investigation and evaluation of Jingning Pumped Stor-age Power Station in Zhejiang Province are carried out to find out whether there are engineering geologi-cal problems.[Methods]Based on geological mapping,drilling,geophysical exploration,indoor test and other engineering methods,detailed engineering geological survey and analysis were carried out in the reservoir area and dam site area.[Findings]The results showed that the engineering geological condi-tions of Jingning Pumped Storage Power Station were good,and there were no serious engineering geo-logical problems.[Conclusions]The research results had important guiding significance for the next en-gineering design and construction scheme determination of Jingning Pumped Storage Power Station.

Jingning of Zhejiang Provincepumped storage power stationengineering geological

李德周

展开 >

浙江华东岩土勘察设计研究院有限公司,浙江 杭州 310000

浙江景宁 抽水蓄能电站 工程地质

2024

河南科技
河南省科学技术信息研究院

河南科技

影响因子:0.615
ISSN:1003-5168
年,卷(期):2024.51(23)