Improve the First Pass Rate of Hot Dip Galvanized Alloy Batching
Since the melting and casting process of a factory was put into operation,in the early stage,due to the lack of skilled personnel,low level of operation skills,new furnace equipment process changes and other reasons,the primary qualification rate of ingredients is low,limiting the improvement of production capacity,resulting in a large backlog of zinc precipitated,a decrease in zinc direct yield,and an increase in production costs.In view of the low primary qualification rate of hot dip galvanized alloy ingredients,a series of measures have been taken,through accurate furnace raw materials,standardized production,strengthening mixing time control,strengthening personnel training and other measures,the primary qualification rate of ingredients has been significantly improved,reaching more than 90%.
hot dip galvanizingbatchingfirst pass rateproduction cost