Scheme Comparison of Project Layout for a Reservoir in South Xinjiang under Complex Geological Conditions
Taking a reservoir project in south Xinjiang as an example,the author discusses the scheme comparison of project layout under complex topographic and geological conditions.By analyzing the existing adverse geological conditions,considering the structural safety of the sluice structure under high head and high flow rate operation and the high slope problem on the right bank,three project layout schemes are proposed.From the aspects of topographic and geological conditions,project layout,hydraulic conditions,operation management,engineering construction,engineering investment and so on,a reasonable and compact project layout scheme is selected,and provide certain reference for similar projects.