桂平航运枢纽水电站扩大装机容量方案研究
Scheme Research on Expanding Installed Capacity of Guiping Shipping Hub Hydropower Station
蓝诚宁1
作者信息
- 1. 广西壮族自治区水利电力勘测设计研究院有限责任公司,广西 南宁 530023
- 折叠
摘要
针对目前桂平航运枢纽水电站存在机组装机容量偏小,枯水季节无法检修,无法充分利用水能资源等问题,笔者通过对装机容量为 25 MW、31 MW的 2 个扩机容量方案进行研究比较,确定最优扩机容量方案,对类似工程具有一定的参考意义.
Abstract
In view of the problems existing in Guiping Shipping Hub Hydropower Station,such as small installed capacity of units,inability to overhaul in dry season,and inability to make full use of hydropower resources,the author studies and compares two capacity expansion schemes with installed capacity of 25 MW and 31 MW,and determines the optimal capacity expansion scheme,which has certain reference significance for similar projects.
关键词
装机容量/增机扩容/方案比选/桂平航运枢纽Key words
installed capacity/expansion of capacity/scheme comparison/Guiping hub hydropower station引用本文复制引用