Layout Design of Congjiang Navigation-Power Junction Project
In view of the poor geological conditions,large flood peak flow and difficult layout of hydroproject of Congjiang Navigation-Power Junction Project,the layout design of the hub is studied.The authors introduce the layout design of navigation structure,sluice structure,power generation building and water retaining structure in detail,expound the design difficulties and put forward the corresponding optimization design measures.The monitoring results show that the hub layout is compact,reasonable and economical,and meets the requirements of the specification.