Research on Optimal Scheduling of Yemao Hydropower Station
In view of the problems existing in the operation of Yemao Hydropower Station under the original scheduling mode,such as the difficulty of impoundment in non-flood season,the low efficiency of power generation,the extensive scheduling rules,and the possibility of flood passing through the top of the gate,the authors study the timing and judging flow of the power station to reduce the water level from the normal storage level from three aspects:the power generation efficiency of different flow rates,the measured flood rise rate and the flood volume in the period,analyzes the risk of impoundment in the recession section of different peak floods,and put forward the optimized scheduling operation mode.The optimal scheduling method can not only avoid the operation risk of the power station,but also increase the power generation benefit.
optimal schedulingscheduling modescheduling operationYemao Hydropower Station