摘要

新疆某水库工程大坝为沥青混凝土心墙砂砾石坝,坝体防渗系统由沥青混凝土心墙+混凝土基座的形式组成.结合地形地质情况,借鉴国内类似工程经验,对工程渗控系统进行合理设计,并采用二维、三维有限元方法进行渗流计算分析.结果表明:在各种计算工况下,工程各部位的渗流场分布合理;各部位的最大渗透比降均未超过其相应部位的允许值,满足渗透稳定要求;坝体、坝基渗流量占河道全年径流量的 1.8‰.该工程渗控系统设计满足规范及设计要求.

Abstract

The dam of a reservoir project in Xinjiang is a sand-gravel dam with asphalt concrete core wall.The anti-seepage system of the dam is composed of asphalt concrete core wall and concrete base.Combined with the terrain and geological conditions,drawing on the experience of similar projects in China,the seepage control system of the project is reasonably designed,and the two-dimensional and three-dimensional finite element methods are used to calculate and analyze the seepage.The results show that the distribution of seepage field in each part of the project is reasonable under various calculation conditions;The maximum permeability gradient of each part did not exceed the allowable value of its corresponding part,which met the requirements of permeability stability;The seepage flow of dam body and dam foundation accounts for 1.8‰of the annual runoff of the river.The design of the seepage control system of the project meets the specifications and design requirements.

关键词

渗流分析/砂砾石坝/沥青混凝土心墙

Key words

seepage analysis/sand-gravel dam/asphalt concrete core wall