Planning and Design of Construction General Layout for Laibin Pumped Storage Power Station in Guangxi
The terrain of the project area of Laibin Pumped Storage Power Station is relatively steep,and the amount of excavated waste is large,so it is difficult to plan and design the construction layout.Combined with the characteristics of the layout of hydroproject and the terrain,the authors study the construction general layout scheme,and focus on the technical and economic analysis and comparison of the discarding dregs planning layout scheme and the sand and stone processing system setting scheme,as well as the construction general layout planning principle and the site layout planning of the upper and lower reservoir construction area.The recommended plan has saved investment costs of 43.1072 million yuan.The research results have certain reference significance for how to carry out the construction site layout of pumped storage power stations with steep terrain.
construction general layoutplanning and designLaibin Pumped Storage Power Station