红水河2024,Vol.43Issue(4) :28-31.DOI:10.3969/j.issn.1001-408X.2024.04.006

大体积混凝土裂缝控制研究

Research on Crack Control in Mass Concrete

沈宏泉 林运胜 周熙
红水河2024,Vol.43Issue(4) :28-31.DOI:10.3969/j.issn.1001-408X.2024.04.006

大体积混凝土裂缝控制研究

Research on Crack Control in Mass Concrete

沈宏泉 1林运胜 1周熙1
扫码查看

作者信息

  • 1. 中国安能集团第一工程局有限公司,广西 南宁 530200
  • 折叠

摘要

大体积混凝土施工过程中由于受到外界环境、施工工艺、施工材料等因素影响极易产生裂缝,影响施工项目质量和施工进度.笔者结合海城 150 MW风电项目,分析混凝土裂缝产生的原因,重点研究裂缝控制措施与对策,以期为类似项目施工提供参考.

Abstract

In the process of mass concrete construction,cracks are easy to occur due to the influence of external environment,construction technology,construction materials and other factors,which affects the construction quality and progress.Based on Haicheng 150 MW wind power project,the authors analyze the causes of concrete cracks,and focus on crack control measures and countermeasures,in order to provide reference for similar project construction.

关键词

大体积混凝土/裂缝控制/风电项目

Key words

mass concrete/crack control/wind power project