Key Risk Factors in Bidding Stage of EPC Project in Hydropower Engineering
The practical application of EPC mode in hydropower engineering is still in its infancy,and there are problems such as insufficient understanding of EPC contract conditions by project participants and unclear allocation of rights and responsibilities.In order to promote the smooth implementation of bidding management for hydropower EPC projects and improve the efficiency of hydropower construction,the author uses the literature research method to collect,sort out and summarize the risk factors in the bidding stage of EPC project in hydropower engineering from the perspective of the owner,and forms an initial list of 33 risk factors.The factor analysis method is used to reduce the dimension of all the identified risk factors,and 30 key risk factors in the bidding stage of EPC project of hydropower engineering are determined,which can provide reference for the owner to carry out risk management in the bidding stage of similar hydropower EPC project.