红水河2024,Vol.43Issue(5) :96-99.DOI:10.3969/j.issn.1001-408X.2024.05.018

某抽水蓄能电站蚀变花岗岩发育程度分级

Development Degree Classification of Alteration Granite in a Pumped Storage Power Station

马加顺 李正顺 宾树毅 宋传星
红水河2024,Vol.43Issue(5) :96-99.DOI:10.3969/j.issn.1001-408X.2024.05.018

某抽水蓄能电站蚀变花岗岩发育程度分级

Development Degree Classification of Alteration Granite in a Pumped Storage Power Station

马加顺 1李正顺 2宾树毅 2宋传星2
扫码查看

作者信息

  • 1. 南方电网调峰调频发电有限公司工程建设管理分公司,广东 广州 510620
  • 2. 中国能源建设集团广西电力设计研究院有限公司,广西 南宁 530007
  • 折叠

摘要

笔者以广西某抽水蓄能电站为例,为研究工程区不同部位蚀变花岗岩的发育程度及判断发育程度的强弱,通过研究工程区蚀变花岗岩特性和参考相关文献的基础上,建立一套蚀变花岗岩发育程度评价等级标准,并应用该标准对工程区各主要部位的蚀变花岗岩发育程度进行评价,得出上水库主坝区、输水发电系统区及下水库主坝区的蚀变花岗岩发育程度等级均为轻微蚀变,而上水库副坝区的蚀变花岗岩发育程度等级为极强蚀变.评价结果与现场定性判断一致,表明该评价标准具有一定的应用价值.

Abstract

Taking a pumped storage power station in Guangxi as an example,in order to study the development degree of alteration granite in different parts of the project area and judge the strength of the development degree,a set of evaluation criteria for the development degree of alteration granite is established by studying the characteristics of alteration granite in the project area and referring to relevant literature.The standard is used to evaluate the development degree of alteration granite in each main part of the project area.It is concluded that the development degree of alteration granite in the main dam area of the upper reservoir,the water conveyance and power generation system area and the main dam area of the lower reservoir are all slight alteration,while the development degree of alteration granite in the auxiliary dam area of the upper reservoir is extremely strong alteration.The evaluation results are consistent with the on-site qualitative judgment,which shows that the evaluation standard has certain application value.

关键词

蚀变花岗岩/发育程度分级/线蚀变花岗岩率/抽水蓄能电站

Key words

alteration granite/development degree classification/linear alteration granite rate/pumped storage power station

引用本文复制引用

出版年

2024
红水河
广西水力发电工程学会 广西电力工业勘察设计研究院

红水河

影响因子:0.132
ISSN:1001-408X
段落导航相关论文