According to the selection principle of the location and axis of the powerhouse,combined with the topographic and geological conditions of the project area,the stability calculation of the surrounding rock of the powerhouse and the overall layout,the authors compare and analyze the location and axis of the underground powerhouse of Pingchuan Pumped Storage Power Station.Under the premise of smooth arrangement of the water conveyance system and meeting the requirements of the axis of the powerhouse on the geological structural plane,the location and axis of the underground powerhouse are selected optimally,which can provide reference for similar engineering design.
关键词
地下厂房/轴线选择/厂房位置/平川抽水蓄能电站
Key words
underground powerhouse/axis selection/powerhouse location/Pingchuan Pumped Storage Power Station