首页|小秦岭金矿区地质灾害分析及治理

小秦岭金矿区地质灾害分析及治理

扫码查看
随着小秦岭金矿区坑口逐渐关闭,开展矿山地质灾害调查和治理工作势在必行.基于矿区地质环境,分析了区域内的地质灾害类型,并采取废渣清运,修筑防护堤、拦渣坝、挡渣墙,沟道整治与道路修复、植被恢复等针对性措施进行治理.小秦岭金矿区修建挡渣墙2.88 万m3,固定矿渣2 002 万t,清运矿渣584 万t,平整渣坡143.5 万m2,修建渣坡排水渠21.2 km,清理疏通河道15.5 km,栽植各类苗木80.7 万株,撒播草种 14.6 t,环境效益显著,可为类似地质灾害治理提供借鉴和参考.
Geological hazard analysis and remediation in Xiaoqinling Gold District
As the shafts in Xiaoqinling Gold District gradually close,it has become imperative to conduct geological hazard investigations and implement remediation measures.Based on the geological environment of the mining area,this study analyzes the types of geological hazards in the region and implements targeted remediation measures,such as waste residue cleaning and transportation,construction of protective dikes,debris retention dams,debris retention walls,trench rehabilitation,road repairs,and vegetation restoration.In Xiaoqinling Gold District,28 800 m3 of debris retention walls were constructed,stabilizing 20.02 million t of ore residue,cleaning and transporting 5.84 million t of residue,leveling 1.435 million m2 of residue slopes,constructing 21.2 km of drainage channels along residue slopes,clearing and dredging 15.5 km of river channels,planting 807 000 saplings,and sowing 14.6 t of grass seeds.The environmental benefits have been significant,providing valuable insights and references for similar geological hazard remediation efforts.

Xiaoqinling Gold Districtgeological hazardsecological restorationprotective dikedebris retention damdebris retention wall

李锐鹏、杨智强、王猛

展开 >

河南省地质矿产勘查开发局第四地质勘查院

小秦岭金矿区 地质灾害 生态修复 防护堤 拦渣坝 挡渣墙

河南省国土资源厅2018年度省财政地质科研项目

豫国土资发[2018]98号-12

2024

黄金
长春黄金研究院

黄金

CSTPCD
影响因子:0.446
ISSN:1001-1277
年,卷(期):2024.45(9)