黄金2024,Vol.45Issue(12) :43-46.DOI:10.11792/hj20241208

小东沟金矿巷道全断面锚网支护参数优化研究与应用

Research and application of full-section bolt mesh support parameter optimization for Xiaodonggou Gold Mine roadways

王义海 李强 袁路成 宋浩 商振朋 李佳建
黄金2024,Vol.45Issue(12) :43-46.DOI:10.11792/hj20241208

小东沟金矿巷道全断面锚网支护参数优化研究与应用

Research and application of full-section bolt mesh support parameter optimization for Xiaodonggou Gold Mine roadways

王义海 1李强 1袁路成 2宋浩 2商振朋 2李佳建3
扫码查看

作者信息

  • 1. 北京科技大学土木与资源工程学院;西和县中宝矿业有限公司
  • 2. 西和县中宝矿业有限公司
  • 3. 北京科技大学土木与资源工程学院
  • 折叠

摘要

巷道支护方式和支护参数的合理选择关系到巷道稳定性和支护成本.针对小东沟金矿巷道支护过程中存在的爆破后金属网损伤面积大、锚杆支护参数不合理等问题,对支护金属网进行了重新选型,设计了不同锚杆支护参数,通过数值模拟分析了不同支护参数下巷道围岩位移场、应力场和塑性区分布.结果表明:顶板位移及围岩塑性区随锚杆间排距增大而增大.锚杆间距由0.9 m增加至1.5 m,顶板最大位移分别依次增大了 37.23%和36.32%.随着锚杆排距增大,顶板最大位移分别依次增大了 26.44%和27.07%.结合支护成本和现场实际条件确定最优锚杆间排距为1.2 m × 1.2 m.工业试验效果较好,支护成本降低12%,支护效率较之前提高20%.

Abstract

The appropriate selection of roadway support methods and parameters is critical to ensuring stability and managing support costs.In Xiaodonggou Gold Mine,problems such as significant damage to metal meshes after blasting and improper bolt support parameters were identified in the support process of roadways.To address these issues,new metal meshes were selected,and various bolt support parameters were designed.Numerical simulations were conducted to analyze the displacement field,stress field,and plastic zone distribution of the surrounding rock under different support parameters.The results indicate that roof displacement and the plastic zone in the surrounding rock increase with greater bolt spacing.When the bolt spacing increased from 0.9 m to 1.5 m,the maximum roof displacement rose by 37.23%and 36.32%,respectively.With increased row spacing,the maximum roof displacement rose by 26.44%and 27.07%.Based on support costs and site conditions,the optimal bolt spacing was determined to be 1.2 m × 1.2 m.Field trials demonstrated good performance,reducing support costs by 12%and improving support efficiency by 20%.

关键词

巷道掘进/分级支护/全断面支护/支护参数/锚网支护/数值模拟/Flac3D软件

Key words

roadway excavation/graded support/full-section support/support parameters/bolt mesh support/numerical simulation/Flac3D software