Application of Barracks Engineering Based on Improved Critical Chain Technology
The project of troop barracks building is different from the traditional construction,and the construction process needs more strict,the construction time cycle needs more urgent,and the construction quality needs more reliable.At present,in the new journey of striving to achieve the century-old goal of building the military and building a world-class military,it needs to further improve the quality and efficiency of troop barracks construction to better serve the construction of military combat effective-ness.This paper takes the garage project in one troop barracks project as an example,focuses on the problem of inadequate control of non-critical chain,the traditional milestone event management concept is introduced,and the milestone buffer of non-critical chain is proposed,so as to effectively deal with the current management of non-critical chain progress control and improve the sta-bility of project progress.From the practical results,the garage project adopts the improved critical chain method to effectively im-prove the ability of non-critical chain to absorb uncertainty,avoid project delay caused by excessive buffer consumption of non-crit-ical chain,and finally improve the robustness of the solution without increasing the total project duration.
troop barracks projectmilestone buffer of non-critical chainrobustness of the solution