Optimization of Project Scheme Based on NSGA-II and Entropy Weight-TOPSIS Method
The design phase of construction projects is often faced with a variety of options.When determining the best solu-tion,it is necessary to ensure that it can maximize the function,and at the same time,it is necessary to minimize the investment cost required for construction,minimize the construction period,and improve the reliability of the project.In order to solve the above problems,a duration-cost-quality multi-objective optimization model based on non-dominance ranking genetic algorithm(NSGA-II.)is proposed,and the entropy weight-TOPSIS method is used to select the appropriate preferred scheme.Taking the con-struction of the airport road as an example,suitable design ideas are provided for it.