首页|水平井PDC钻头的井底流场数值模拟

水平井PDC钻头的井底流场数值模拟

扫码查看
为了解决页岩水平井岩屑运移困难、钻头泥包等问题,提高聚晶金刚石复合片(polycrystalline dia-mond compact,PDC)PDC钻头在钻井过程中的钻井效率和使用寿命,采用数值模拟方法、低雷诺数k-ԑ湍流模型建立井底的流场模型,对PDC钻头的水力结构在不同钻井液排量、PDC钻头转速和岩屑粒径工况下的井底流场变化和岩屑运动状态进行分析并优化改进.结果表明:重力作用对低排量下的岩屑运动状态影响较大,当钻井液排量增加到一定程度后,岩屑运移效率变化较小;在旋转工况下,钻井液排量和钻头转速不匹配,降低了钻井液的冲刷作用和岩屑运移效率;在一定排量和钻头转速下,钻头转速对大粒径岩屑运移效率的提升作用大于对小粒径岩屑的;在相同的喷嘴面积下,优化后的 8喷嘴钻头岩屑运移效率优于 6喷嘴钻头的;相比非等径喷嘴组合,等径喷嘴组合的性能表现更均衡.
Numerical simulation of bottomhole flow field of PDC bit in horizontal well
Objectives:Horizontal wells can effectively improve the economic benefits of shale oil and gas develop-ment.However,as the horizontal section extends,the rock debris transport efficiency of the PDC drill bit gradually de-creases,which can lead to bit balling in severe cases.Consequently,it is costly to directly improve the hydraulic struc-ture of PDC bits.This paper uses a multi-physics field coupling numerical simulation method to analyze the influence of the coupling of different drilling process parameters and drill bit structure parameters on the bottom hole flow field and improves the drill bit hydraulic structure to enhance the rock debris transport efficiency of the PDC drill bit.Methods:Using COMSOL multi-physics field coupling simulation software,a geometric model of the bottom hole flow field of the horizontal well was established.The low Reynolds number k-ԑ model was employed to simulate the coupling of flu-id flow and particle motion in the fluid,and iterative calculations were performed.The low Reynolds number k-ԑ model could adapt to different Reynolds number regions,especially the influence of molecular viscosity in the viscous bottom layer in the low Reynolds number region on the mixed phase flow.Parameters close to the actual drilling conditions were used to set the boundary conditions of the coupling model,and the grid independence of the coupling model was verified to reduce simulation error.Changes in the bottom hole flow field and the movement of rock debris by the PDC bit in a horizontal well under different drilling fluid displacement,PDC bit rotation speeds,and rock debris particle sizes were analyzed.Results:In the numerical simulation results of the coupling model,the following findings were ob-served:(1)From the flow velocity distribution diagram on the bottom hole wall,it was observed that the hydraulic en-ergy distribution on the bottom hole wall became more uniform with an increase in displacement.When the displace-ment is 35 L/s,the flow velocity distribution effect on the bottom hole wall is optimal.However,the low-speed flow area of drilling fluid at the bottom hole cannot be completely eliminated by increasing displacement.In the comparative analysis of the retention of bottom hole rock debris at different displacements,an increase in displacement can reduce the impact of gravity on the cleaning of bottom hole rock debris.However,once the displacement reaches a certain level,the degree of cleaning of bottom hole rock debris changes relatively little.(2)In the lateral drilling fluid flow line at different rotation speeds,the flow rate gradually increases with an increase in rotation speed,causing a significant de-viation in the flow state of the drilling fluid.When comparing and analyzing the accumulation of rock debris particles and the average velocity of rock debris particles,it was found that as the drill bit rotation speed increases,the fluctu-ation of the average velocity of rock debris particles also gradually increases.Although increasing drill rotation speed raises the average velocity of rock debris particles,it does not improve the migration efficiency of rock debris beyond a certain rotation speed.When the rotation speed is 240 r/min,the rock debris migration efficiency is the lowest.(3)In the comparative analysis of the average speeds of different rock debris particles,the farther they are from the bottom of the well,the faster the speed of large-size rock debris decays due to gravity.The speed change of small-size particles is rel-atively stable,but the average speed of rock debris particles with mixed particle sizes falls in the middle.(4)With roughly the same displacement area,increasing the number of drill bit nozzles from six to eight significantly reduces the amount of rock debris retention.(5)Compared with the equal diameter nozzle combination,the combination of a large inside and small outside nozzle reduces the transport efficiency of large particle rock debris due to the weakening of the drilling fluid flow rate.However,the flow rate in the central area of the combination of a small inside and large outside nozzle is reduced,which fails to form a strong pressure difference,resulting in an overall reduction in rock debris migra-tion efficiency.Conclusions:Increasing the drilling fluid displacement improves the hydraulic energy and the rock debris transport efficiency at the bottom hole wall,but after the displacement increases to a certain level,it has little ef-fect on the change in the degree of rock debris cleanliness at the bottom of the well.The mismatch between the high speed of the drill bit and displacement increases the average speed of the rock debris,but does not improve rock debris transport efficiency.Within a certain range of rock debris particle sizes,gravity has a relatively small impact on larger-size rock debris due to the influence of rotational force and turbulent kinetic energy.The transport efficiency of larger-size rock debris is higher than that of smaller-size rock debris.However,the farther away from the bottom of the well,the greater the impact of gravity on larger-size rock debris,resulting in greater velocity attenuation than that of smaller-size rock debris.According to the bottom hole flow field state under different drilling process parameters,the number of drill bit nozzles increase from six to eight under roughly the same nozzle displacement area,the hydraulic energy distri-bution is more uniform and the transport efficiency of rock debris improves.Meanwhile,compared to non-equal diamet-er nozzle combinations,equal diameter nozzle combinations perform more balancedly.

horizontal wellPDC bithydraulic structurebottomhole flow fieldsimulation

李赛、王红波、程书婷、蔡茂盛、张春江

展开 >

长江大学 石油工程学院,油气钻采工程湖北省重点实验室,武汉 430100

中石化石油机械股份有限公司,武汉 430074

水平井 PDC钻头 水力结构 井底流场 模拟仿真

2024

金刚石与磨料磨具工程
郑州磨料磨具磨削研究所

金刚石与磨料磨具工程

CSTPCD北大核心
影响因子:0.354
ISSN:1006-852X
年,卷(期):2024.44(4)
  • 11