首页|城市雨污分流摇管及微型顶管施工技术

城市雨污分流摇管及微型顶管施工技术

扫码查看
为解传统污水管道施工周期长、对周围环境影响大的问题,提出了 一种采用摇管施工污水管道的方法.摇管施工是一种先进的管道施工方法,施工速度快、对周围环境影响小,特别适用于城市污水管道工程.现场实际施工表明,采用摇管施工方法可以快速完成管道的安装,管道安装质量、密封性和稳定性较传统施工方式有了很大的提高.通过采用摇管施工方法,可以有效解决污水处理问题,实现污水的有效排放并避免对河流造成污染.
Construction technology of urban rain and sewage diversion swaying pipe and micro-pipe jacking
In order to solve the problem of long construction period of traditional sewage pipe and great influence on the surrounding environment,a method of construction of sewage pipe with swaying pipe technology was put forward.Shaking pipe construction is an advanced pipeline construction method,the construction speed is fast,the impact on the surrounding environment is small,especially suitable for urban sewage pipeline engineering.The actual construction shows that the installation of the pipe-line can be completed quickly by using the swaying pipe construction method,and the installation quality,sealing and stability of the pipeline are greatly improved compared with the traditional con-struction method.By using the method of swaying pipe construction,the problem of sewage treatment can be effectively solved,the effective discharge of sewage can be realized and the pollution to the river can be avoided.

rain sewage diversionswaying pipe technologymicro-pipe jacking technologypipeline qualityconstruction technology

李新

展开 >

中铁十四局集团第二工程有限公司,山东泰安 271000

雨污分流 摇管技术 微型顶管技术 管道质量 施工工艺

2024

建井技术
煤炭科学研究部院

建井技术

影响因子:0.85
ISSN:1002-6029
年,卷(期):2024.45(2)
  • 12