首页|跨孔电阻率CT技术在立井地面预注浆效果检查中的尝试

跨孔电阻率CT技术在立井地面预注浆效果检查中的尝试

扫码查看
立井井筒在遇到含水层或松软破碎岩层时,地面预注浆是常用的堵水加固技术,但对于注浆效果的检查和评价一直没有可靠的手段.物探技术的飞速发展为地面预注浆效果检查带来新的希望.然而,迄今为止国内外尚未有通过物探手段对竖井地面预注浆效果进行检查与评价的报道.通过对物探技术的介绍,分析了常规底面物探技术无法在较深立井地面预注浆效果检查中应用的原因,阐述了超高密度跨孔电阻率CT技术的原理、方法和仪器,并在云南滇中引水工程香炉山引水隧洞新增竖井地面预注浆中进行现场尝试应用.结果表明,超高密度跨孔电阻率CT技术具有分辨率高、多解性低以及全自动、快速采集的特点.通过钻孔深入注浆地层进行测试,相比地面物探方法能更准确地反映地层物性参数变化情况,对较大尺度范围深部地面预注浆效果的定性检查评价是可行的,应进行更多的研究和尝试.
The attempt of cross-hole resistivity CT technique to check the effect of ground pre-grouting in the shaft
When the shaft excavation meets aquifers or soft broken formations,ground pre-grouting is a common water blocking and strengthening technology,but there is no reliable means to check and e-valuate the grouting effect.The rapid development of geophysical exploration technology brings new hope for the inspection of ground pre-grouting effect.However,up to now,there are no reports of checking and evaluating the effect of ground pre-grouting of shaft by means of geophysical exploration.Based on the introduction of geophysical exploration technology,this paper analyzed the reason why the conventional geophysical exploration technology could not be applied in the inspection of the ground pre-grouting effect of the deep shaft,and the principle,method and instrument of the ultra-high density cross-hole resistivity CT technology was expounded,and tried to apply it in the ground pre-grouting of the new shaft in the Xianglu Mountain water diversion tunnel of the Yunnan Dianzhong Diversion Project.The results show that ultra-high density cross-hole resistivity CT tech-nology has the characteristics of high resolution,low ambiguity and automatically rapid data collection.Compared with the ground geophysical exploration method,the test through drilling into the grouting stratum can more accurately reflect the change of the formation physical property param-eters,and the qualitative inspection and evaluation of the deep ground pre-grouting effect in a large scale is feasible,and more studies and attempts should be made.

water diversion tunnelground pre-grouting in the shaftinspection of grouting resultgeo-physical exploration technologycross-hole resistivity CT

左永江、陈振国、李生生、安许良

展开 >

北京中煤矿山工程有限公司,北京 100013

矿山深井建设技术国家工程研究中心,北京 100013

天地科技股份有限公司,北京 100013

引水隧洞 立井地面预注浆 注浆效果检查 物探技术 跨孔电阻率CT

天地重点自立项目

KJ-2022-JJZD-02

2024

建井技术
煤炭科学研究部院

建井技术

影响因子:0.85
ISSN:1002-6029
年,卷(期):2024.45(4)