首页|三巷开挖对巷道群稳定性影响的数值模拟研究

三巷开挖对巷道群稳定性影响的数值模拟研究

扫码查看
以华能云南滇东能源有限责任公司雨汪煤矿一井主要巷道为研究背景,采用数值模拟的方法,设计了三巷开挖的方案,并对比分析了不同巷道开挖顺序下的巷道群的应力场、位移场和破损区变化特征.研究发现,在巷道群开挖施工中,开挖顺序虽然对整体的应力场和位移场没有太大的影响,但在某些特定的工程区域,其应力、位移和破坏范围会有显著差异.因此,导致整个巷道群区域的破坏类型、破坏范围和分布规律存在明显不同,并通过方案对比设计出最佳施工工序方案.该研究成果为类似巷道群的设计与施工提供了必要的理论指导.
Numerical simulation study on influence of three-roadway excavation sequence on stability of roadway group
Based on the research background of the main roadway of Yuwang Coal Mine of Huaneng Yunnan Yunnan East Energy Company Limited,a three-roadway excavation scheme was designed by using numerical simulation method,and the characteristics of stress field,displacement field and damage zone changes of roadway groups under different excavation sequences were compared and ana-lyzed.It is found that the excavation sequence has no great influence on the overall stress field and dis-placement field,but in some specific engineering areas,the stress,displacement and failure range will be significantly different.Therefore,the damage type,damage range and distribution law of the whole roadway group area are obviously different,and the best construction sequence plan is designed by comparing the schemes.The research results provide necessary theoretical guidance for the design and construction of similar roadway groups.

roadway groupthree-roadway excavationdesign and constructionsequence of excavationnumerical simulation

孙福龙、李永元、赵清全、周文斌、姜琦、吴彬

展开 >

华能煤炭技术研究有限公司,北京 100070

华能云南滇东能源有限责任公司矿业分公司 雨汪煤矿一井,云南 曲靖 655000

巷道群 三巷开挖 设计与施工 开挖顺序 数值模拟

国家科技重大专项

2016ZX05068

2024

建井技术
煤炭科学研究部院

建井技术

影响因子:0.85
ISSN:1002-6029
年,卷(期):2024.45(5)