首页|基于煤粉预气化强稳燃的快速调峰燃烧器5 MW中试研究

基于煤粉预气化强稳燃的快速调峰燃烧器5 MW中试研究

扫码查看
煤粉预气化强稳燃技术能够兼顾稳定燃烧与NOx排放控制.基于此,开发了服务于电站锅炉灵活调峰的快速调峰燃烧器,并依托5 MW燃烧试验平台进行热态中试试验,对比不同负荷下的运行性能,研究燃烧器的极限稳燃负荷与快速变负荷能力.结果表明:煤粉进入燃烧器所带有的小型预气化室后发生气化反应,转化为高温燃气和炽热碳粒所组成的预热燃料.在低负荷下,预热燃料进入炉膛后将迅速燃烧,形成根部高温区,保证炉膛稳燃.随着负荷升高,预气化室内气化反应更加充分,配合回流烟气形成良好还原性气氛,实现有效降氮.在无辅助手段条件下,满负荷工况NOx排放为159 mg/m3(6%O2),飞灰含碳率为3.4%,折算燃烧效率99.71%.在9%超低负荷下,快速调峰燃烧器仍能维持炉膛稳定燃烧,在1 h以上长时间连续运行过程中,出口氧量保持稳定.在15%~100%负荷分别用时8和9 min完成快速降负荷与升负荷过程,降、升负荷速率分别可达10.63%/min与9.44%/min.变负荷过程中炉内燃烧保持稳定,且温度分布对负荷变化的响应速度较快,验证了该燃烧器在快速调峰过程中的出色性能.
5 MW pilot test study of rapid peaking burner based on pre-gasification strong stable combustion of pulverized coal
The strong stable combustion technology of pulverized coal pre-gasification can balance stable combustion and NOx emis-sion control.Based on this principle,a rapid peaking burner for flexible peaking of power plant boilers had been developed,and the oper-ation performance under different loads,the minimum stable combustion load and rapid load variation capacity of the burner were studied on a 5 MW combustion test rig.The results showed that,after entering the small pre-gasification chamber attached to the burner,the pul-verized coal would undergo gasification reaction and transform into preheated fuel composed of high temperature gas and hot carbon parti-cles.Under low load,the preheated fuel would burn rapidly after entering the furnace,forming a high temperature zone at the root to en-sure the steady combustion of the furnace.With the increase of load,the gasification reaction in the pre-gasification chamber was more complete,and reducing atmosphere was formed with the return flue gas to achieve effective nitrogen reduction.The NOx emission at full load was 159 mg/m3(6%O2)without any auxiliary means,and the carbon content of fly ash was 3.4%,meaning combustion efficien-cy was 99.71%.The rapid peaking burner could still maintain the stable combustion of the furnace under the ultra-low load of 9%,and the outlet oxygen remains stable during the long-term continuous operation of more than one hour.In the range of 15%to 100%load,the rapid load reduction and load rise processes were completed in 8 min and 9 min,and the load ramp rates reached 10.63%/min and 9.44%/min respectively.During the process of load change,the combustion in the furnace remained stable,and the temperature distribu-tion had a fast response to the load change,which verified the excellent performance of the burner in the process of rapid peak regulating.

pre-gasification strong stable combustionRapid peakingBurnerPilot testNOx emission

张瀚霖、周旭、舒逸翔、郑海国、林山虎、李杰、刘舒畅、闫伟杰、谭厚章、王学斌

展开 >

西安交通大学热流科学与工程教育部重点实验室,陕西西安 710049

清洁燃烧与烟气净化四川省重点实验室,四川成都 611731

南京理工大学能源与动力工程学院,江苏南京 210094

预气化强稳燃 快速调峰 燃烧器 中试试验 NOx排放

国家重点研发计划青年科学家资助项目

2022YFB4100500

2024

洁净煤技术
煤炭科学研究总院 煤炭工业洁净煤工程技术研究中心

洁净煤技术

CSTPCD北大核心
影响因子:0.893
ISSN:1006-6772
年,卷(期):2024.30(9)
  • 19