首页|一种双回路220kV线路反向π接钢管杆方案的研究

一种双回路220kV线路反向π接钢管杆方案的研究

Research on the Reverse π Connected Steel Pipe Pole Scheme for Double Circuit 220 kV Transmission Lines

扫码查看
针对在电网工程规划、设计和建设中220 kV架空输电线路的π接越来越难的问题,设计了一种接线简单、占地少、施工停电时间短、便于施工和维护的π接钢管杆方案,并与常规π接方案对比,在某220 kV线路工程的实际应用中,验证了所提方案的可行性和有效性.
In response to the increasingly difficult problem of π connection of 220 kV overhead transmission lines in power grid engineering planning,this paper proposes a π connection steel pipe pole scheme with simple wiring,less land occupation,short construction power outage time,and easy construction and maintenance.Compared with conventional π connection schemes,the feasibility and effectiveness of the proposed scheme have been verified in the practical application of a certain 220 kV line project.

overhead transmission line220 kVsteel pipe pole

曹彦斌、刘洋、于志红

展开 >

中国电建集团吉林省电力勘测设计院有限公司,长春 130022

架空输电线路 220 kV 钢管杆

2024

吉林电力
吉林省电机工程学会,吉林省电力有限公司电力科学研究院

吉林电力

影响因子:0.338
ISSN:1009-5306
年,卷(期):2024.52(1)