Analysis and Evaluation of Flood Control Impact of a Storm Water Outlet Crossing Dike Project
The Pier-crossing buildings is the weak link in the embankment project,which is af-fected by various factors and is easy to cause seepage damage.Whether the construction of dike-cross-ing buildings affects the management and application of dikes and the safety of flood crossing,we should analyze and evaluate the impact of flood control from many aspects and put forward reasonable sugges-tions,so as to make the construction plan of river-related Projects more reasonable,ensure the subse-quent efficient,safe and sustainable operation,and provide valuable reference for similar construction projects.
Pier-crossing buildingsseepage interceptiondiversionenergy dissipation and ero-sion prevention