Centralized Operation and Maintenance Improvement of Electrical Monitoring and Control System
Shaanxi Yanchang Coal Yulin Energy and Chemical Co.,LTD.(hereinafter referred to as"Yuleng Hua")110 kV No.1 and No.2 have become the power dispatching centralized control center of the whole plant,which adopts the manned and shift mode.The No.1 and No.2 general transformer monitor,control and undertake data collection and safe operation of the electrical equipment of the first and second line substations in Yuneng Hua through Guodian Nanrui D5000 and Dongfang Electronics DF8003D power dispatching system respectively.With the development of the company,the contradiction between the shortage of production personnel and the increase of inspection workload is becoming increasingly prominent.In this form,the No.1 General transformer of Yuleng Chemical Company establishes an intelligent inspection system to integrate and integrate the status information and video images of the equipment operation to improve the centralized operation and maintenance of the electrical monitoring and control system.
electrical monitoring and control systemintelligent inspection systemunattended data analysis