Research on Optimization and Governance of Ash Transport System in Economizers
The article is based on the optimization and renovation project of the economizer ash conveying system of Guoneng Jinjie Energy Co.,Ltd.,with reference to cases such as Jiujiang Power Plant and Chenjiagang Power Plant for analysis,and designs an optimization and renovation plan based on a pilot type low-pressure energy-saving unit fluidized pneumatic conveying system.The results showed that by installing a pilot type low-pressure energy-saving unit fluidized pneumatic conveying system,installing a dedicated gas tracing pipeline for automatic plug valves,and optimizing the original control system,the ash conveying system did not experience pipe blockage,the throttle rate was significantly improved,and the energy-saving effect was significant,saving a lot of energy for the enterprise.
economizerash conveying systempilot type low-pressure energy-saving unit fluidized pneumatic conveying system