今日自动化2024,Issue(5) :40-42.

电力系统网架重构阶段电压优化调整方案

Voltage Optimization and Adjustment Plan for Power System Grid Reconstruction Phase

孔亚伟 薛凌峰 尹曙光
今日自动化2024,Issue(5) :40-42.

电力系统网架重构阶段电压优化调整方案

Voltage Optimization and Adjustment Plan for Power System Grid Reconstruction Phase

孔亚伟 1薛凌峰 1尹曙光1
扫码查看

作者信息

  • 1. 国网冀北电力有限公司廊坊供电公司,河北廊坊 065000
  • 折叠

摘要

网架重构阶段是电力系统恢复的重要阶段,需要使电网各个节点更快更优地满足约束条件.文章基于PSS/E给出的OPF优化方案,将无功优化措施对电网的影响进行计算,提出就近调整原则,最后通过山东电网的算例验证了该方案的可行性.

Abstract

The grid reconstruction stage is an important stage for the restoration of the power system,and it is necessary to make each node of the power grid meet the constraint conditions faster and better.This article is based on the OPF optimization scheme provided by PSS/E,calculates the impact of reactive power optimization measures on the power grid,proposes the principle of nearby adjustment,and finally verifies the feasibility of this scheme through a case study of Shandong power grid.

关键词

电力系统恢复/PSS/E仿真/网架重构/无功优化/就近调整

Key words

power system recovery/PSS/E simulation/grid reconstruction/reactive power optimization/adjust nearby

引用本文复制引用

出版年

2024
今日自动化

今日自动化

ISSN:
段落导航相关论文