网架重构阶段是电力系统恢复的重要阶段,需要使电网各个节点更快更优地满足约束条件.文章基于PSS/E给出的OPF优化方案,将无功优化措施对电网的影响进行计算,提出就近调整原则,最后通过山东电网的算例验证了该方案的可行性.
Voltage Optimization and Adjustment Plan for Power System Grid Reconstruction Phase
The grid reconstruction stage is an important stage for the restoration of the power system,and it is necessary to make each node of the power grid meet the constraint conditions faster and better.This article is based on the OPF optimization scheme provided by PSS/E,calculates the impact of reactive power optimization measures on the power grid,proposes the principle of nearby adjustment,and finally verifies the feasibility of this scheme through a case study of Shandong power grid.

power system recoveryPSS/E simulationgrid reconstructionreactive power optimizationadjust nearby

孔亚伟、薛凌峰、尹曙光

展开 >

国网冀北电力有限公司廊坊供电公司,河北廊坊 065000

电力系统恢复 PSS/E仿真 网架重构 无功优化 就近调整