The grid reconstruction stage is an important stage for the restoration of the power system,and it is necessary to make each node of the power grid meet the constraint conditions faster and better.This article is based on the OPF optimization scheme provided by PSS/E,calculates the impact of reactive power optimization measures on the power grid,proposes the principle of nearby adjustment,and finally verifies the feasibility of this scheme through a case study of Shandong power grid.
关键词
电力系统恢复/PSS/E仿真/网架重构/无功优化/就近调整
Key words
power system recovery/PSS/E simulation/grid reconstruction/reactive power optimization/adjust nearby