Research on Automatic Dispatching Control Strategy for Pump Sluice Group in Weiqu District
In order to achieve informatization and automation of the pump gate group in the polder area,this article designs the automation control system of the polder pump station and proposes an optimization plan for scheduling strategy based on the orthogonal experimental method.Through 9 orthogonal experiments,the total energy consumption of each startup plan and operating rule is obtained.Then,the optimal scheduling plan is obtained by sorting the energy consumption.This plan not only effectively improves the automation and informatization level of the pump gate group in the polder area,but also strengthens scheduling control and reduces total energy consumption.
pump gate group in polder areaautomationscheduling control