首页|ZGM95-3中速辊式磨煤机油站控制系统存在的问题及整改措施

ZGM95-3中速辊式磨煤机油站控制系统存在的问题及整改措施

扫码查看
针对建投邢台热电有限责任公司的2×350MW机组磨煤机油站控制系统熔断器在运行可靠性上无法满足要求的问题,存在着影响机组负荷的事故隐患,判断磨辊控制回路中的继电器和液压换向阀控制回路中的继电器通电后电流过大是导致1号熔断器短路的主要原因,提出了磨煤机油站控制系统加装单级开关的改造方案,以保证机组安全可靠稳定运行,提高机组的经济效益.
The Problems and Rectification Measures of the ZGM95-3 Medium Speed Roller Coal Mill Oil Station Control System
In response to the problem that the control system fuse of the coal mill oil station of the 2 × 350 MW unit of Jiantou Xingtai Thermal Power Co.,Ltd.cannot meet the requirements in terms of operational reliability,there is a hidden danger of affecting the unit load.It is judged that the main reason for the short circuit of fuse 1 is the excessive current of the relay in the control circuit of the grinding roller and the relay in the control circuit of the hydraulic reversing valve after being energized.A renovation plan is proposed to install a single-stage switch in the control system of the coal mill oil station to ensure the safe,reliable and stable operation of the unit and improve the economic benefits of the unit.

coal mill oil station systemfusesunipolar switch

潘红、刘亚辉

展开 >

建投邢台热电有限责任公司,河北邢台 054000

磨煤机油站系统 熔断器 单极开关

2024

今日自动化

今日自动化

ISSN:
年,卷(期):2024.(7)
  • 3