The article takes the Qinan 500 kV substation as an example to introduce the construction plan of the 500 kV substation project,including the installation of the main transformer,electrical equipment design,distribution equipment,station power system equipment installation,lightning protection and grounding device installation measures for the whole station,and environmental protection construction.It provides technical reference for the subsequent construction of the 500 kV substation project.