For the power industry,with the deep integration of renewable energy and industry,the operation and scheduling of AC/DC distribution networks are facing increasing pressure.In this regard,the article focuses on in-depth analysis of power flow calculation and multi time scale optimization scheduling methods for AC/DC distribution networks.Firstly,based on MPC,a multi time scale optimization scheduling model is constructed.then,through case analysis,the above model is applied to compare the differences between power flow calculation methods and traditional power flow calculation methods,and the role of this method in the stable operation of the distribution network is explained in detail.Finally,draw corresponding conclusions for reference.
关键词
交直流配电网/潮流计算/多时间尺度优化调度
Key words
AC/DC distribution network/tidal flow calculation/multi time scale optimization scheduling