江苏建材2024,Issue(1) :3-5.

热电厂桩基项目旋挖成孔灌注成桩工艺

曹达
江苏建材2024,Issue(1) :3-5.
✕

热电厂桩基项目旋挖成孔灌注成桩工艺

曹达1
扫码查看

作者信息

  • 1. 中晋(内蒙古)资源环境科技有限公司,内蒙古呼和浩特 010000
  • 折叠

摘要

文章以金山热电厂项目为例,按照桩基旋挖成孔灌注的工艺流程,重点对旋挖成孔灌注技术的测量放线、成孔、钢筋笼施工、混凝土灌注等具体施工工艺进行论述,最后对该技术在施工过程中的钻孔质量和混凝土浇筑质量两方面提出控制措施,希望可以有效推动旋挖钻孔成桩施工技术的发展与运用,并带动整体建筑的质量提升.

Abstract

Taking the Jinshan thermal power plant project as an example,this paper focuses on the specific construction techniques such as measurement and pay-off,hole formation,reinforcement cage construction,concrete pouring and other specific construction technologies of rotary drilling and pouring technology according to the process of rotary excavation and hole casting,and finally puts forward control measures for the drilling quality and concrete pouring quality of the technology in the construction process,hoping to effectively promote the development and application of rotary drilling and pile forming construction technology in the future,and drive the quality improvement of the overall building.

关键词

电厂/桩基施工/旋挖钻孔/成桩技术应用

Key words

power plant/pile foundation construction/rotary drilling/application of pile forming technology

引用本文复制引用

出版年

2024
江苏建材
江苏省建材工业协会

江苏建材

影响因子:0.257
ISSN:1004-5538
被引量1
参考文献量1
段落导航相关论文