In order to solve the difficulties in the production,transportation,and installation of gravity caisson wharf,this paper takes a newly built 500t caisson gravity passenger and cargo wharf in Yantai City,Shandong Province as the research object,analyzes the geological conditions of the site,studies the process flow of each construction link of gravity caisson wharf,and conducts settlement observation based on the geological conditions of soft soil in the site.