首页|重力式沉箱码头施工工艺研究应用

重力式沉箱码头施工工艺研究应用

扫码查看
为解决重力式沉箱码头在制作、运输和安装施工中的难题,以某新建500 t沉箱重力式客货码头为研究对象,在分析场区地质条件的基础上,研究了重力式沉箱码头各个施工环节的工艺流程,并进行沉降量观测。
In order to solve the difficulties in the production,transportation,and installation of gravity caisson wharf,this paper takes a newly built 500t caisson gravity passenger and cargo wharf in Yantai City,Shandong Province as the research object,analyzes the geological conditions of the site,studies the process flow of each construction link of gravity caisson wharf,and conducts settlement observation based on the geological conditions of soft soil in the site.

gravity caisson wharfconstruction processfloating stabilitystructural installation

刘来钰

展开 >

山东港通工程管理咨询有限公司,山东 烟台 264000

重力式沉箱码头 施工工艺 浮运稳定性 结构安装

2024

江苏建材
江苏省建材工业协会

江苏建材

影响因子:0.257
ISSN:1004-5538
年,卷(期):2024.(1)