This paper studies the design of new beam joints of prefabricated engineering concrete structures,analyzes the design methods of beam joints in combination with dry connection and wet connection,and develops the new beam connection joint form of prefabricated concrete structures,and introduces practical cases to study the specific research.The results of the engineering case study show that the form of the joint in the beam is the best,which meets the requirements of seismic resistance,construction and transportation,and can be applied to prefabricated engineering projects.
关键词
预制装配式建筑/混凝土结构/梁连接节点/节点设计
Key words
prefabricated buildings/concrete structures/beam link nodes/node design