In this study,considering the complex soil conditions of the site and the special requirements of the hospital building for the safety and stability of the foundation,the punched cast-in-place pile was selected as the foundation treatment scheme,and the effects of different pile lengths,pile lengths,pile diameters and pile spacing on the composite foundation were analyzed through numerical simulation.The research results will provide valuable reference and reference for similar projects.
foundation workspunched pilesnumerical simulationcomposite foundations