This paper focuses on the supervision and control of aluminum alloy formwork construction in green building projects,summarizes the characteristics and advantages and disadvantages of aluminum alloy formwork in detail,analyzes the key points of supervision and control from the three stages of pre-construction preparation,installation process and acceptance stage,and combines the common problems in the construction process to put forward specific prevention and control measures in the position of tension screw and steel bar,difficulty and service life of angle formwork,precise opening of aluminum formwork installation pipeline,concrete pouring,etc.,in order to provide a useful reference for the sustainable development of green building industry.
green building projectsaluminum alloy formwork constructionsupervision and control