Extension and Support of Optical Cable Network during Deplayment Stage of the Army
In order to solve the problem of optical cable network extension during the deployment stage of the ar-my,the research was carried out on the site selection of the mobile communication shelter and the optimization of the communication topology.A multi-point continuous location problem model with topology optimization was established to control the cost of battlefield construction and shorten the time consuming.A two-layer optimization algorithm com-bining manta ray foraging optimization and genetic algorithm was constructed to solve the problem,whice adoptes the idea of location-topology optimization.In order to solve the problem and improve the performance of the algorithm,improvements such as initial population design,metropolis criterion,shunting competition optimization,and double-standard co-check termination were introduced.Simulation and analysis show that the proposed model method has good performance and can achieve optimal address and topology optimization.
Optical cable extensionMulti-facility locationTopology optimizationManta ray foraging optimizationGenetic algorithm