Application of Combined Process of Three Stage AO+Advanced Treatment in Small and Medium Sized Urban WWTPs
Due to the improvement of discharge standards and changes in inflow water quality,a wastewater treatment plant(WWTP)in Chengdu City needs to be upgraded and renovated.After renovation,the processing scale is 2 500 m3/d remains unchanged,and the effluent quality needs to meet the Water Pollutant Discharge Standards for the Minjiang and Tuojiang River Basins in Sichuan Province(DB 51/2311-2016).In response to unfavorable factors such as unstable inflow and water quality,severe limitations on investment and land use,and a concentration of inflow water that far exceeds that of ordinary urban domestic sewage,this project adopts a non-stop water transformation method that fully utilizes the original biochemical tank,transforms it into a tertiary AO tank,and builds a new advanced treatment facility.This transformation method which can investment,not require new land acquisition,has strong impact resistance,and only needs a short period of pipe collision to stop water.After the transformation,the process operation is stable and reliable,meeting the requirements of DB 51/2311-2016(CODCr≤30 mg/L,ammonia nitrogen≤1.5 mg/L,total nitrogen≤10 mg/L,total phosphorus≤0.3 mg/L).This can provide reference experience for the upgrading and renovation of small and medium-sized urban sewage plants.
multi-stage AOhigh density sedimentation tankdenitrification deep bed filter(DDBF)upgrading and reconstructioncontinuous water supply reconstruction