净水技术2024,Vol.43Issue(10) :167-175.DOI:10.15890/j.cnki.jsjs.2024.10.021

基于原址不停水目标的某污水厂提标改扩建工程设计与运行

Design and Operation of Upgrading and Expansion of WWTP Based on In-Situ Land Use and Non-Stop Operation during the Renovation Period

高靖伟 韩磊 江乐勇 刘发 李赛
净水技术2024,Vol.43Issue(10) :167-175.DOI:10.15890/j.cnki.jsjs.2024.10.021

基于原址不停水目标的某污水厂提标改扩建工程设计与运行

Design and Operation of Upgrading and Expansion of WWTP Based on In-Situ Land Use and Non-Stop Operation during the Renovation Period

高靖伟 1韩磊 1江乐勇 1刘发 1李赛2
扫码查看

作者信息

  • 1. 信开环境投资有限公司,北京 101101
  • 2. 北京桑德环境工程有限公司,北京 101102
  • 折叠

摘要

原污水处理厂现状规模为 8 万m3/d,出水执行《城镇污水处理厂污染物排放标准》(GB 18918-2002)中的一级B标准,采用氧化沟+二沉池处理工艺,占地面积约为 53 395 m2.采用以膜生物反应器(MBR)+紫外光催化臭氧氧化为主体的改造工艺路线,满足不新增用地要求,规模扩建至 18 万m3/d,吨水占地仅为 0.296 m2/m3,出水标准提高至北京市《城镇污水处理厂水污染物排放标准》(DB11/890-2012)中的B标准.充分利用原有处理单元进行提标改扩建,主要为利旧扩增粗格栅提升泵房、将原氧化沟改造为改良厌氧-缺氧-好氧(AAO)工艺,主体生化单元按(10 万+8 万)m3/d两系列模式先后实施.提标改扩建工程共分三阶段实施,实现施工期间不停水且维持原出水标准.预处理及深度处理单元土建按远期建设,总投资约为 5.4 亿元,其中相关设计思路可供类似工程参考.

Abstract

The current treatment capacity of this wastewater treatment plant(WWTP)is 80 000 m3/d,and the standard of effluent is the national first class B standard.The oxidation ditch+secondary sedimentation tank process is adopted with area coverage of 53 395 m2.The main upgrading process of membrane bio-reactor(MBR)+ultraviolet photocatalytic ozone oxidation combined oxidation is adopted to meet the requirement of no new land use.The scale can be expanded to 180 000 m3/d,and tons of water covered only 0.296 m2/m3.The effluent standard raises to the B standard in Beijing Discharge Standards for Water Pollutants from Urban Sewage Treatment Plants(DB11/890-2012).In full use of the original treatment unit for upgrading reconstruction and expansion,the original coarse screen lifting pump room process is used through expansion,the original oxidation ditch process is transformed into modified anaerobic-anoxic-oxic(AAO)process.The main biochemical unit is successively implemented according to the two series of models of(100 000+80 000)m3/d.Reconstruction and expansion requirements are realized in three stages to achieve uninterrupted water supply and maintain the original effluent standard during construction.Civil construction of pre-treatment and advanced treatment unit according to the long-term construction,the total investment is about 540 million yuan,of which the relevant design ideas can be used as reference for similar projects.

关键词

膜生物反应器(MBR)/紫外光催化臭氧氧化/提标改扩建/不新增用地/不停水

Key words

membrane bio-reactor(MBR)/UV photocatalytic ozonation/upgrading reconstruction and expansion/no new land use/non-stop water supply