超大跨度立交桥跨越既有隧道施工过程安全性分析

扫码查看
多层立交桥梁在施工时,会对下层既有隧道产生较大的安全隐患.文章以某超大跨度立交桥钢箱梁跨越既有隧道施工为例,通过三维空间有限元法及生死单元技术对钢箱梁施工过程进行了模拟分析,并对有限元计算结果与监测数据进行了安全分析,可为同类工程的安全评估及防护提供参考.
Safety Analysis of Super Long Span Viaduct Crossing Existing Tunnel during Construction
During the construction of multi-storey viaduct,there will be great potential safety hazards for the existing tunnels in the lower layer.In this paper,taking the construction of a super long span steel box girder viaduct crossing an existing tunnel as an example,the construction process of the steel box girder is simulated and analyzed by using the three-dimensional space finite element method and the birth death element technology,and the safety analysis of the finite element calculation results and monitoring data is carried out,which can provide a reference for the safety evaluation and protection of similar projects.

viaductcrossingtunnelsecurity

刘洋、于佳欢

展开 >

南京城市建设管理集团有限公司,江苏南京 210028

立交桥 跨越 隧道 安全

2024

江苏建筑
江苏省土木建筑学会,江苏省建筑科学研究院有限公司

江苏建筑

影响因子:0.395
ISSN:1005-6270
年,卷(期):2024.(1)
  • 8