地铁车站基坑开挖施工过程中,因降水井失效,不能起到良好的降水作用,导致基坑开挖过程及见底后泡槽,严重影响车站的正常施工进度和基底地基承载力.文章针对深圳地铁车站基坑降水质量问题进行深度剖析,提出了有效的处理措施.失效的降水井恢复功能,实现了良好的降水效果,解决了基底泡槽的问题,保证后续施工正常进行.
Analysis and Solution Measures for Dewatering of Foundation Pit in Subway Stations
During the excavation process of the subway station foundation pit,due to the failure of the dewatering well,it cannot provide good dewatering effect,resulting in the excavation process of the foundation pit and soaking after reaching the bottom,seriously affecting the normal construction progress of the station and the bearing capacity of the substrate foundation.A deep analysis was conducted on the quality problem of foundation pit dewatering in Shenzhen subway station,and effective treatment measures were proposed.The ineffective dewatering well was revived and achieved good dewatering effect.This measure solved the problem of base bubble groove and ensured the normal progress of subsequent construction.

subway stationconstruction of dewatering wellsfoundation pit dewatering

卜俊文、武建飞

展开 >

中建四局土木工程有限公司,广东深圳 518000

地铁车站 降水井施工 基坑降水