Research and Practice on Digital Green Construction Technology for Heterogeneous Biomimetic Art Buildings
With the rapid development of China's economy and the transformation and upgrade of the construction industry,the implementation of the"carbon peaking and carbon neutrality"strategy has urged various industries to carry out industrial transformation.Located in Shenzhen,the Phase 1 and Phase 2 of the Marisfrolg Headquarter Project is designed by Mr.Fred,a New Zealand architect.The project's structural system utilized bionic principles that nature has evolved over billions of years,and used the wisdom of biomechanics to achieve the optimal solution of thin shells and long-span structures.Meanwhile,the project made a creative attempt in building material selection and used recycled construction wastes as decorative materials,providing a new idea for construction solid waste treatment.Digital construction technology is desperately needed to achieve the design expression of the unique structure and decoration,as well as the structure checking of biomimetic art buildings,which made this building a true BIM forward design project.Combining digital construction technology and engineering practices,our company managed to overcome difficulties such as surveying and positioning,product processing,and site operating,and built an office complex that combines bionics and environmental protection.