首页|地铁深大基坑开挖对临近双曲拱桥的影响分析

地铁深大基坑开挖对临近双曲拱桥的影响分析

扫码查看
文章以南京地铁S8号线某地铁车站为背景,针对地铁车站基坑开挖对临近双曲拱桥变形规律进行研究.重点研究了不同厚度地下连续墙、MJS施工加固等对双曲拱桥的变形影响,通过各项监测数据分析表明:MJS施工期间双曲拱桥的变形总体小于围护结构期间桥墩沉降;基坑本身及临近双曲拱桥变形主要集中在基坑开挖阶段;基坑回筑期间对双曲拱桥变形影响微乎其微,变形规律符合基坑开挖对周边环境变形影响,通过信息化监测可较好地指导施工,可为类似实际工程提供参考.
Analysis of the Impact of Subway Deep and Large Pits Excavation on Adjacent Two-way Curved Arch Bridges
This paper is based on a subway station on Line S8 of the Nanjing Metro,and studies the deformation law of the adjacent two-way curved arch bridge caused by the excavation of the subway station foundation pit.It focuses on studying the effects of different thicknesses of underground continuous walls and MJS construction reinforcement on the deformation of the two-way curved arch bridge.Through various monitoring data analysis,it is found that the deformation of the two-way curved arch bridge during MJS construction is generally smaller than the settlement of the bridge piers during the enclosure structure period.The deformation of the foundation pit itself and adjacent two-way curved arch bridges is mainly concentrated in the excavation stage of the foundation pit.The impact of excavation on the deformation of the two-way curved arch bridge during the backfilling period of the foundation pit is minimal,and the deformation pattern is consistent with the deformation impact of excavation on the surrounding environment.Through information monitoring,construction can be better guided and reference can be provided for similar practical projects.

subway stationsexcavation of foundation pitsperipheral settlementtwo-way curved arch bridge

杨明、周骏、王南周、包子宇

展开 >

南京市公共工程建设中心,江苏南京 210019

江苏省地质工程勘察院,江苏南京 210012

江苏华测测绘工程有限公司,江苏南京 210000

地铁车站 基坑开挖 周边沉降 双曲拱桥

2024

江苏建筑
江苏省土木建筑学会,江苏省建筑科学研究院有限公司

江苏建筑

影响因子:0.395
ISSN:1005-6270
年,卷(期):2024.(3)